Full room · Kitchen

Kitchen Remodeling · Albuquerque

A kitchen remodel is really a logistics project wearing a design project's clothes. Ours run through one shop — demo, cabinets, stone, finish — so the sequence holds and the phone number never changes.


ScopeRefresh → full remodel
AreaABQ · Rio Rancho · Santa Fe
Direct(505) 203-5508
01

Pick your level of change

The refresh

Keep the layout, transform the surfaces: new countertops, backsplash, hardware, maybe paint-grade door fronts. Maximum visual change per dollar.

The rebuild

Same footprint, everything new: custom cabinets, stone, sink and fixtures. The most common full remodel.

The rework

Layout changes — moving the island, opening a wall section, rethinking the work triangle. Scoped honestly at the estimate, including what needs other trades.

02

The sequence that keeps remodels sane

Design & itemized quote

Layout, materials, and a written number broken out line by line — you approve scope, not vibes.

Demo & prep

Old kitchen out, surfaces prepped, surprises (there are always one or two behind old cabinets) flagged the day they're found.

Cabinets set

Boxes installed, leveled and locked — because stone gets templated off the real cabinets, not the drawings.

Stone template → fabrication → install

Counters measured off the finished cabinet run, cut in our shop, installed. This hand-off is where outsourced jobs stall; here it's one calendar.

Finish work

Backsplash, hardware, plumbing reconnects, final punch list — then the room is yours again.

Timelines depend on scope and material lead times — you'll get the honest schedule with your quote, not a slogan.

03

Decisions to start chewing on

Come to the estimate with opinions (or questions) on these and the design conversation moves twice as fast: island size and seating, sink style, counter material, cabinet wood vs paint, backsplash direction, and which appliances are staying. Photos of kitchens you love help more than you'd think — even phone screenshots.

FAQ

Good questions, straight answers

Do I need to move out during a kitchen remodel?

Usually no — most clients set up a temporary kitchen corner and live around the work. We'll tell you at the quote which phases are the loud, dusty ones so you can plan around them.

Can I keep my appliances?

Absolutely, and it's a common budget move. We just need models and dimensions early so cabinets and counters are built to fit them exactly.

What adds the most cost to a kitchen remodel?

Moving things: plumbing, gas and walls. Keeping the layout and upgrading surfaces delivers most of the visual transformation at a calmer number — and we'll show you both paths in the itemized quote if you're weighing them.

Who manages the project?

Jesus does — the same person who measured your kitchen. One point of contact from first visit to punch list is the whole operating model here.

Talk to the person who does the work

Call or text Jesus directly for a free on-site estimate — no call center, no sales layer. Serving Albuquerque, Rio Rancho, Santa Fe, Edgewood and the East Mountains.

Keep reading — related sheets
Call Text Free Estimate →